Australian concrete tools

Concrete Calculator Australia

Calculate concrete volume in cubic metres for slabs, footings, trenches and round post holes. Add waste, round an order quantity and optionally convert the result to premix bags using the yield printed on your product.

Enter dimensions

Choose a shape, then enter the finished concrete dimensions. Use the quantity field for repeated identical pours.

metres (m)

metres (m)

millimetres (mm)

identical items / pours

percent (%)

litres per bag — check product label

Concrete required

Results update as you change the inputs.

Net concrete volume—
With waste allowance—
Total litres—
Planning order quantity—
Premix bags—

Enter the manufacturer-stated litres per bag to calculate bags.
Ordering tip: the planning order quantity is simply rounded up to the next 0.1 m³. Ready-mix suppliers may use different order increments, minimum loads, delivery charges and site-access requirements.

How to calculate concrete volume

Concrete is normally ordered by volume in cubic metres (m³). For rectangular work, multiply the finished length, width and depth after converting all dimensions to metres.

Slab: length × width × thickness
Footing or trench: length × width × depth
Round hole or pier: π × radius² × depth

Allowing for waste

The calculator adds your selected waste percentage after working out the geometric volume. The right allowance depends on excavation accuracy, formwork, subgrade, access, pumping and how the concrete will be placed, so adjust the percentage to suit the job rather than treating one value as universal.

Premix bags

Bag yield varies by product. If you are using bagged premix, enter the yield in litres shown on the manufacturer’s packaging or current product data. SiteSum then rounds the required number of bags up to the next whole bag.

Concrete calculator FAQs

How many cubic metres of concrete do I need for a slab?

Multiply slab length by width by thickness in metres. For example, a 6 m × 4 m slab at 100 mm thick has a geometric volume of 2.4 m³ before any waste allowance.

Should I order exactly the calculated amount?

Usually you should consider an allowance for waste and site variation, but the appropriate amount is project-specific. Confirm final dimensions and ordering requirements with your concrete supplier before placing an order.

Can I use this for footings and post holes?

Yes. Select Footing / trench for rectangular excavations or Round post hole / pier for cylindrical holes. For irregular excavations, break the work into simpler shapes and add the volumes together.

Planning estimate only: SiteSum calculators are intended for preliminary estimating and checking. They do not replace project measurements, structural design, supplier requirements or professional advice.

Related SiteSum tools: use the Concrete Bag Calculator for bag counts and optional material cost, or the Concrete Slab Calculator for slab-specific quantities, or browse the Concrete Calculators hub.