Slab dimensions

Enter finished slab dimensions. Thickness is a project input only — use your drawings, specification or engineer’s design.

metres (m)

metres (m)

millimetres (mm)

quantity

percent (%)

AUD per m³ — enter your supplier rate

AUD — only add costs not already included in your concrete rate

Slab estimate

Results update as you change the inputs.

Total slab area—
Total perimeter formwork—
Net concrete volume—
With waste allowance—
Planning order quantity—

rounded up to the next 0.1 m³ for planning only
Total concrete litres—
Estimated concrete + entered fixed costs—
Use the perimeter carefully: this is the outside rectangular perimeter only. Internal rebates, thickenings, edge beams, steps and construction joints can change formwork and concrete quantities.

How the concrete slab calculation works

Area = length × width
Concrete volume = length × width × thickness in metres
Perimeter = 2 × (length + width)

For more than one identical slab, SiteSum multiplies the area, perimeter and volume by the quantity entered. Waste is added after the geometric concrete volume is calculated.

Concrete slab cost estimate

If you enter a current supplier rate per cubic metre, the calculator applies that rate to the concrete quantity including waste. You can separately add delivery, pumping or another fixed cost. Leaving the rate blank keeps the tool as a quantity calculator.

Slab calculator FAQs

What slab thickness should I enter?

Enter the thickness shown on your project drawings or specified by the responsible designer. SiteSum does not choose structural slab thickness or reinforcement for you.

Does the calculator include edge beams or thickened areas?

No. The main result assumes a uniform rectangular slab. Calculate beams, thickenings and irregular sections separately and add their additional volume where required.

Why is the order quantity rounded up?

The rounded figure is only a planning aid. Concrete suppliers may have different minimum loads and ordering increments, so confirm the final quantity directly with your supplier.

Need footings, trenches or round post holes? Use the general Concrete Calculator Australia →

Planning estimate only: SiteSum provides preliminary quantity and cost estimates. It does not replace structural design, project drawings, supplier requirements, site measurement or professional advice.